GHOST: A Paranormal Discussion Forum
Would you like to react to this message? Create an account in a few clicks or log in to continue.

A tunnel project must start with a comprehensive investigation

Go down

A tunnel project must start with a comprehensive investigation Empty A tunnel project must start with a comprehensive investigation

Post by jancancook Sun Mar 27, 2011 8:44 am

A tunnel project must start with a comprehensive investigation of ground conditions by collecting samples from boreholes and by other geophysical techniques. An informed choice can then be made of machinery and methods for excavation and ground support, which will reduce the risk of encountering unforeseen ground conditions. In planning the route the horizontal and vertical alignments will make use of the best ground and water conditions.

In some cases conventional desk and site studies yield insufficient information to assess such factors as the blocky nature of rocks, the exact location of fault zones, or the stand-up times of softer ground. This may be a particular concern in large diameter tunnels. To give more information a pilot tunnel, or drift, may be driven ahead of the main drive. This smaller diameter tunnel will be easier to support should unexpected conditions be met, and will be incorporated in the final tunnel. Alternatively, horizontal boreholes may sometimes be drilled ahead of the advancing tunnel face.

rent a villa in rhodes
Air conditioning
jancancook
jancancook
Master of the Paranormal
Master of the Paranormal

Male
Number of posts : 468
Age : 39
Location : Viet Nam
Registration date : 2011-02-15

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum